Here's the plan for 2007,
Here are the new stainless steel down pipes, made by Startwin. Here they still need to be polished.
Here's a photo of the end cans that will be transplanted onto the eliminator.
Here they are still on the Z1000.
Well here the end cans are fitted. The brackets are a temporary measure, I want to design something in auto-cad to replace them.
Here's a shot from the side.
Log in with uID